|
| |
 |
2007 Government VM Conference Meeting Minutes (PDF) |
| |
 |
"FORT BLISS, TXMILCON Transformation: A Strategy to Support Army Basing Initiatives" by Jack Shelton PE, CCE (PowerPoint) |
| |
 |
Taking your turn at LEED (PowerPoint) |
| |
 |
"A Value Based Approach To Selection" by Professor John R Kelly (PowerPoint) |
| |
 |
"VALUE ENGINEERING……in the Lean Environment!" by Dave Love (PowerPoint) |
| |
 |
"VALUE ENGINEERING……in the Lean Environment!" Distribution Statement (PDF) |
| |
|
|
 |
2006 Government VM Conference Notes (Word) |
|
 |
“Reducing Total Ownership Cost and Value Engineering” by Dr. Danny Reed, Institute for Defense Analyses (Power Point) |
|
 |
“VM in Hong Kong: Research and Development” by Professor Geoffrey Qiping Shen, The Hong Kong Polytechnic University (PDF) |
|
 |
“Using VM and FPS to Prepare a Framework for the Development of a Comprehensive Traffic Volume Information System”by Lucie Parrot, Eng., CVS and Tom Fletcher, P.Eng., CVS(Power Point) |
|
 |
“Value Analysis Harnesses Internal Resources for Process Change” by U.S. Cost, Inc. (Power Point) |
|
 |
“Value Engineering Role in Emergency Preparation, Response and Recovery” by Frank Vicidomina, PE, CVS, U.S. Army Corps of Enginers, New Orleans and Ron Tanenbaum, PhD, PE, GE, CVS, GeoVal, Inc. (Power Point) |
| |
|
|
 |
A Synthesis of Hwy Practice VE Applications in Transportation (Power Point) |
|
 |
A VE Community of Practice in DoD, Dr Reed, Institute for Defense Analyses (PDF) |
|
 |
Baca School LEED & VE Presentation July 16 (PDF) |
|
 |
Red River Floodway Value and Risk Study Government Conf Pres (PDF) |
|
 |
Rejuvinating the DOE VM Program - July 16, 2004 (PDF) |
|
 |
VM to Manage Change in Montreal - Merging 19 cities into one (PDF) |
|
|
|
|
 |
|
Agenda |
|
 |
Opening |
|
 |
Chicago Underflow Plan |
|
 |
Claiborne Avenue Bridge Replacement |
|
 |
Current DoD Value Engineering Initiatives |
|
 |
Using VM To Infuse Innovative Technologoies Into DOE Environmental Remediation Projects |
|
 |
Implementing a Change in Culture |
|
 |
Value Based Team Decision-Making |
|
 |
Barracks Criteria/Quality |